Skip to main content

Description and Scope

The project description is displayed on the Overview page; the scope is displayed on the Governance page.

The description should start with a concise paragraph of three to five sentences (e.g. suitable for display with a collection of other projects). A single paragraph is generally appropriate for the description.

If more than a single simple paragraph is required to fully describe the project, it is possible to set a summary. The summary can be specified by toggling the show summary link to explicitly set a summary apart from the more detailed description, or the top part of the description can be designated as the summary by inserting a Teaser Break into the content.

Note: Providing a summary gives you control over what will get rendered. In views where we are displaying more than one project, the system will artificially cut short descriptions that are too long, potentially resulting in a description that looks weird.

The scope is intended for a more select audience; generally speaking the scope should be taken directly from the project’s proposal.

Warning: Project members have the ability to change the text of the project scope, but should be careful to avoid changing the meaning. If the meaning of the scope needs to change, the Project Management Committee (PMC) must be contacted regarding a potential restructuring review.

To edit the description and/or scope:

  • Log into the PMI;
  • Navigate to the project page;
  • Click Edit;
  • Open the section labelled The Basics;
  • Update the fields as required; and
  • Click Save.